McKnight Crossings Church of Christ
The back stage wall needs repair.
Initial idea to remove wooden slats/ribs and then drywall over the back wall and paint. We should
consider if we would want to remove the dangly lights and HVAC vents at some point in the future.
Click any image for full-size view
This demo only works in browsers that support CSS Grid Layout. If you can see this message, then your
browser isn't supporting Grid. You can try out Grid in
Firefox Nightly or
other browsers by flipping a flag.
-
S-1
-
S-2
-
S-3
-
stage 1
-
stage 2
-
stage 3
-
ceiling-1
-
ceiling-2
-
stage-3
-
stage-4
-
stage-4
-
stage-5
-
stage-5
-
stage-6
-
stage-6
-
stage-7
-
stage-7
-
stage-8
-
stage-8
-
stage-8
-
finish
-
finish
-
finish
Attic Above Stage
2021 Auditorium Memo
Keaton & stage wall comments
2023 Design Team memo
Stage Speakers Renkus-Heintz IC 16/8 0608-1429
SASV Construction
SASV Accepted Quote
09.16.2023 Pre-Work Update
Final Payment
Paint color:
The main backwall is Sherwin-Williams SW 0037 Morris Room Grey (flat)
The soffits are Sherwin-Williams SW7030 Anew Grey